Toll Warehouse - James Fletcher Drive, Auckland

This massive cross dock facility was built without any saw cuts in the slabs to reduce the cost of joint maintenance. Conset were contracted to MacRennie Commercial Construction to design the slabs and to construct all the in situ concrete; foundations, slabs and track slab.

Project Technical Info

  • Completion Date:

    2019

  • Main Contractor:

    MacRennie Construction

  • Square metres:

    55,000m2

  • Engineer:

    Day Consulting Engineers, slab design by Conset

  • Cubic Meters:

    15,000m3